Fingrid 400 kV cable site in Helsinki

Substations and power lines

The success of the green transition requires large-scale investments to increase the capacity and flexibility of electricity networks and to efficiently integrate renewable energy production into the electricity system.

GRK Power focuses primarily on the construction of electricity transmission networks (110/400 kV) and substations.

  • Extensive and versatile personal references – over 10 years of industry experience
  • Strong relationships with transmission and regional grid companies
  • Broad international networks and partners

Before you choose a contractor

9

substation and feeder station projects in our references

Substations are familiar to us

Our rail feeder station expertise, now for energy parks and battery storage.

110–400

kV voltage levels

From the transmission grid to the substation

From transmission networks to energy park and battery storage substations.

872.3

EUR million group revenue 2025

A financially solid partner

Large contractors have failed in this industry. Your partner can afford to carry the responsibility.

  • ISO 45001 Occupational health and safety
  • ISO 9001 Quality
  • ISO 14001 Environment
  • Tukes electrical contracting qualification S1

What we do

  • Energy park substations

    We design, supply, install and commission an energy park's substation from the line connection to the switchgear outgoing terminals, and fit its work to the rest of the park's construction.
    Voltage levels
    110 and 400 kV transmission networks
    Delivery models
    Turnkey delivery and EPC (engineering, procurement and construction from one supplier)

    Have a project in mind?

    Janne Kananen, Business Director, Energy and Power construction

    +358 40 631 8181 janne.kananen@grk.fi Contact us
  • Battery energy storage substations (BESS)

    We design, install and commission the substation of a battery energy storage system. The batteries are made and installed by the equipment supplier.
    Projects
    Wind, solar and battery storage projects

    Have a project in mind?

    Janne Kananen, Business Director, Energy and Power construction

    +358 40 631 8181 janne.kananen@grk.fi Contact us
  • Rail feeder stations and high current

    We build the feeder stations and high-current systems of railways and tramways. Railway substations are almost the same as grid substations, so our substation expertise grew from rail.

    Have a project in mind?

    Janne Kananen, Business Director, Energy and Power construction

    +358 40 631 8181 janne.kananen@grk.fi Contact us
  • Power lines and 110–400 kV underground cables

    We deliver 110–400 kV power lines turnkey and build underground cable connections, such as Fingrid's 400 kV cable from Vantaa to Helsinki.

    Electricity network construction has significant synergies with the current business. Robust electricity transmission lines require extensive foundation and road infrastructure, which GRK has successfully implemented for several years.

    Turnkey deliveries
    110–400 kV power lines and substations

    Have a project in mind?

    Janne Kananen, Business Director, Energy and Power construction

    +358 40 631 8181 janne.kananen@grk.fi Contact us
  • Wind farm grids and infrastructure

    We build the whole infrastructure of a wind farm except the turbines (Balance of Plant, BoP): ground surveys, design, roads, crane pads, foundations and the park's internal grid with its substation.
    Covers
    Wind power, solar power, and battery energy storage systems (BESS)

    Have a project in mind?

    Janne Kananen, Business Director, Energy and Power construction

    +358 40 631 8181 janne.kananen@grk.fi Contact us

The strengths of the Power business are built on GRK’s expertise

GRK is expanding profitably into new areas of infrastructure construction and strengthening its role in green transition projects.

Electricity network construction has significant synergies with the current business. Robust electricity transmission lines require extensive foundation and road infrastructure, which GRK has successfully implemented for several years. In substation construction, GRK’s experience from rail construction provides experience – railway substations are almost the same. Circular economy materials can also be utilized in our projects.

Demanding projects

How a project progresses

Design together

We take part already in project development. Design is part of the turnkey delivery.

Quotation and delivery model

We make a quotation and agree on the model: general contract, design and build, target cost contract or alliance.

Construction

The substation, power line or cable, and their foundations and roads.

Handover and warranty

We hand over the finished site with its documentation and are responsible for the work during the warranty period.

Design not finished yet? Let’s design together

We assess buildability, methods and costs before the design is locked. A half-finished design is fine.

Help with the design

We go through the draft with you and propose solutions that are easier and more affordable to build. Someone from the site, who knows how the solution is really built, takes part.

A design partner for the whole project

In design and build and target cost contracts, we design ourselves or together with your designer. Our designer stays on board until commissioning and updates the design quickly when something on site goes differently than planned.

Does the method fit your design?

As a designer, you can check the method directly with an expert before it goes into your design.

Delivery models

We agree on the delivery model to suit the project. The earlier we are involved, the more we can influence solutions and costs.

  • Design and build

    GRK is responsible for both design and construction. The client defines the result.
  • Target cost contract (ST)

    The basic solutions are decided. GRK develops the detailed design together with the designer and builds.
  • Alliance

    The client, the designers and GRK form a joint organisation and share goals and risks.
  • General contract

    The client commissions the design, and GRK builds the whole project under one contract.

An energy, data centre or industrial project?

This is how we deliver the whole project by industry.

Fortum heat storage under construction in Espoo

Energy

Substations and grid connections for energy parks.

Excavator loading blasted rock onto a dumper

Data centres

The substation and grid connection of the site.

Helsinki shipyard intermediate gate site

Industry

Electrification and substations for growing demand.

Frequently asked about substations

We design, supply, install and commission the energy park substation from the line connection to the switchgear outgoing terminals. At the Kalkkimaa energy park in Tornio, GRK is responsible for the whole substation from the 110 kV line connection to the 33 kV switchgear.

Yes. We deliver 110–400 kV power lines turnkey. For Fingrid, we are building the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.

Yes. The substation, the power line and their foundations and roads come from the same group.

Yes. The battery storage itself is made and installed by the equipment supplier.

We focus on 110 and 400 kV transmission networks and substations.

Yes. We also deliver 110–400 kV power lines and substations as EPC projects, with engineering, procurement and construction from one supplier.

No. We design a substation or power line as part of a turnkey delivery or an EPC project, but we do not sell design on its own.

Contacts

Tell us what you need, and the right person will contact you.

Tell us about your project

A few sentences are enough. The right expert will get back to you.

This field is for validation purposes and should be left unchanged.
We process your data in accordance with our privacy notice.

Work at GRK

Infrastructure is a growth industry where the work matters. With us, you get as much responsibility as you dare to take.

Two GRK asphalt workers paving a road