Skip to content
Excavator loading blasted rock onto a dumper

Building data centres from site to substation

GRK is an infrastructure contractor that makes the data centre site ready to build on and builds its infrastructure from the foundations to the 110 kV substation. KSBR, part of the group, delivers the underground engineering and concrete structures.

  • From site to substation in one group
  • Certified quality, environmental and safety systems
  • We work in Finland, Sweden and Estonia

Before you choose a contractor

2

data centre projects under way in the group

We build data centres today

GRK and KSBR are building them for a technology company in Finland.

9

power and feeder substation projects in our references

The grid connection from the same group

Site, foundations and substation from the same group.

872.3

EUR million group revenue 2025

We can carry a large contract

Large contractors have failed in this industry. Your partner can afford to carry the responsibility.

  • ISO 45001 Occupational health and safety
  • ISO 9001 Quality
  • ISO 14001 Environment
  • Tukes electrical contracting qualification S1

The whole data centre infrastructure from one contractor

In a data centre project the schedule is tight and the work stages depend on each other. When one contractor owns the whole chain, interfaces do not delay the project.

Stage 1: site preparation and earthworks

Site preparation and earthworks

We make the site ready to build on: clearing, excavation, rock excavation, fills and soil replacement. We also handle contaminated soil and take surplus soil to our own reception sites. When the ground is done right, the next stages start on schedule.

Stage 2: foundations and piling

Foundations and piling

The heavy structures and equipment of a data centre need a load-bearing base. We reinforce the ground, drill piles and build the foundations for the building, transformers and backup power, also on soft ground.

Stage 3: municipal engineering

Municipal engineering

We build the site’s water supply, sewers and stormwater systems and the pipe connections. The cooling water and pipe lines are designed at the same time, so they do not cross the cable routes later.

Stage 4: roads and yards

Roads and yards

Heavy machinery drives on the site roads throughout construction, and once finished they become service routes. We build the yards, parking, fields and paving with our own equipment.

Stage 5: cabling

Cabling

We install the medium and high voltage cabling, cable ducts and protective conduits from the substation to the data centre. The cable routes are built in the same contract as the earthworks, so trenches do not need to be opened twice.

Stage 6: substation and grid connection

Substation and grid connection

We build the substation and the connection to the transmission grid in line with Fingrid’s requirements. We know the connection process, so the grid connection progresses alongside the other work and does not become the project’s bottleneck.

Demanding projects

For international project owners

Many data centre projects come to Finland from abroad. We guide you through Finnish construction practice.

Involved from the development phase

We assess feasibility and give a budget price before the call for tenders.

Permits and grid connection

We know the local permitting processes and the stages of Fingrid’s connection process.

A fast start

We start work with our own equipment and people once financing is secured.

One contact

The same person is responsible for the whole delivery.

How a project progresses

Design together

We know the Finnish requirements and design the solutions to meet them, turnkey.

Quotation and delivery model

We make a quotation and agree on the model: general contract, design and build, target cost contract or alliance.

Construction

Site preparation, foundations, underground engineering and the substation with the group’s own resources.

Handover and warranty

We hand over the finished site with its documentation and are responsible for the work during the warranty period.

Investment decided, but the design only beginning? Let’s design together

We assess buildability, methods and costs before the design is locked. A half-finished design is fine.

Help with the design

We go through the draft with you and propose solutions that are easier and more affordable to build. Someone from the site, who knows how the solution is really built, takes part.

A design partner for the whole project

In design and build and target cost contracts, we design ourselves or together with your designer. Our designer stays on board until commissioning and updates the design quickly when something on site goes differently than planned.

Does the method fit your design?

As a designer, you can check the method directly with an expert before it goes into your design.

Delivery models

We agree on the delivery model to suit the project. The earlier we are involved, the more we can influence solutions and costs.

  • Design and build

    GRK is responsible for both design and construction. The client defines the result.
  • Target cost contract (ST)

    The basic solutions are decided. GRK develops the detailed design together with the designer and builds.
  • Alliance

    The client, the designers and GRK form a joint organisation and share goals and risks.
  • General contract

    The client commissions the design, and GRK builds the whole project under one contract.

One group, the whole delivery

The GRK group delivers the data centre from earthworks to the concrete frame and the substation.

Cross-section of a finished data centre site with numbered points: GRK's soil replacement, drilled piles to bedrock, the municipal engineering trench and stormwater basin, roads and yards, the cable route and the substation with its power line, and KSBR's pile slab and concrete frame
  1. Site preparation and earthworks
  2. Foundations, piling and pile slabs
  3. Concrete frame and cast-in-place structures
  4. Municipal engineering
  5. Roads and yards
  6. Cabling
  7. Substation and grid connection

Frequently asked about building data centres

Yes. We are currently delivering the preparatory work, mass transfers, rock excavation and logistics areas of a data centre site for a technology company; the contract is worth about EUR 66 million.

Yes. We build 110 kV substations from design to commissioning and the cable connections with their foundations, and for Fingrid we are doing the construction work for a 400 kV underground cable.

Yes. KSBR, part of the group, delivers the underground engineering and concrete structures of data centres.

Yes. On a data centre site, safety, order and documentation are handled to the level of an international client, and we induct every worker in the client’s rules before work starts.

Finland, Sweden and Estonia. Both of our data centre projects under way are in Finland.

Contacts

Every part of a data centre project has its own responsible person.

Tell us about your project

A few sentences are enough. The right expert will get back to you.

This field is for validation purposes and should be left unchanged.
We process your data in accordance with our privacy notice.

Work at GRK

Infrastructure is a growth industry where the work matters. With us, you get as much responsibility as you dare to take.

Two GRK asphalt workers paving a road