Fingrid 400 kV cable link (another GRK site)
Construction work for the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.

GRK is an infrastructure contractor that builds the infrastructure of wind and solar farms, battery storage and power plants, from roads and foundations to the substation and grid connection. The turbines, panels and batteries come from the equipment supplier.
In a wind farm, the roads, foundations, cables and substation depend on each other. When one contractor owns the whole Balance of Plant delivery, the turbines go up on schedule.

We investigate the ground and dimension the roads and foundations accordingly. We clear the road and pad areas and replace soil so heavy machinery can move.

We build the farm’s roads and a crane pad for every turbine to carry special transports and cranes. The finished roads later serve maintenance traffic.
We build the turbine foundations: reinforcement, casting and anchoring to bedrock or piles. They are class 1 concrete structures, which we know from designing and building bridges.
We install the medium voltage cables from the turbines to the substation. The cables run beside the roads, so the trenches are dug with the same equipment as the roads.
We build the farm’s substation from design to commissioning: the yard, foundations, transformers, switchgear and control building.
We build 110–400 kV power lines and cable connections to the transmission grid. The connection progresses alongside the construction of the farm.
872.3
EUR million group revenue 2025
Large contractors have failed in this industry. Your partner can afford to carry the responsibility.
9
power and feeder substation projects in our references
Our rail feeder station expertise, now for energy parks and battery storage.
2/3
of our references for repeat clients
Two out of three projects were for a client who had chosen us before.
Balance of Plant (BoP) means all of a wind farm’s infrastructure except the turbines: ground investigations, design, roads, crane pads, foundations and the farm’s internal power grid with its substation.
We build the substations and connections of battery storage and energy parks from design to commissioning. The batteries and panels come from the equipment supplier.
We deliver an energy park’s 110 kV substation in full, from the line connection to the switchgear, and fit it to the construction of the rest of the park.
We deliver 110–400 kV power lines turnkey with their foundations and build cable connections to the transmission grid.
We build energy production plant areas and act as the main contractor of a production plant.
One contact is responsible for the whole project. Tell us what you are planning, and we will tell you how we would build it.
Construction work for the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.
An electric district heating plant with a 50 MW electric boiler and an 800 MWh heat storage.
GRK is responsible for the whole substation, from the 110 kV line connection to the 33 kV switchgear.
We take part already in project development. Design is part of the turnkey delivery.
We make a quotation and agree on the model: turnkey delivery, design and build, or EPC (engineering, procurement and construction from one supplier).
Roads, foundations, cabling and the substation with the group’s own resources.
We test and commission the substation and hand it over to the client.
We assess buildability, methods and costs before the design is locked. A half-finished design is fine.
Design help
We go through the draft with you and propose solutions that are easier and more affordable to build. Someone from the site, who knows how the solution is really built, takes part.
In design and build and target cost contracts, we design ourselves or together with your designer. Our designer stays on board until commissioning and updates the design quickly when something on site goes differently than planned.
As a designer, you can check the method directly with an expert before it goes into your design.
We agree on the delivery model to suit the project. The earlier we are involved, the more we can influence solutions and costs.
In a wind farm, all of the infrastructure except the turbines: ground investigations, design, roads, crane pads, foundations and the internal power grid with its substation.
We build the substations of battery storage from design to commissioning, and the batteries come from the equipment supplier. In Rovaniemi, we are building a 110/10 kV substation for a 30 MW, 80 MWh battery storage.
We build the wind farm’s roads, crane pads, turbine foundations, internal power grid and substation, so the whole infrastructure comes from the same group.
Yes. We act as the main contractor of a production plant: in Espoo, we built Fortum an electric district heating plant with a 50 MW electric boiler and an 800 MWh heat storage.
Yes, for power lines and substations. EPC means that engineering, procurement and construction come from one supplier.
Finland, Sweden and Estonia. Our energy projects are, for example, in Tornio, Rovaniemi and Espoo and between Vantaa and Helsinki.
Tell us what your project needs, and the right person will contact you.
Janne Kananen
Business Director, Energy and Power construction
Jaakko Mäkelä
Business Director, Civil Engineering and Paving
Petteri Hakkarainen
Tender Pricing Manager
A few sentences are enough. The right expert will get back to you.
Infrastructure is a growth industry where the work matters. With us, you get as much responsibility as you dare to take.