Fingrid 400 kV cable link (another GRK site)
Construction work for the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.

The success of the green transition requires large-scale investments to increase the capacity and flexibility of electricity networks and to efficiently integrate renewable energy production into the electricity system.
GRK Power focuses primarily on the construction of electricity transmission networks (110/400 kV) and substations.
9
substation and feeder station projects in our references
Our rail feeder station expertise, now for energy parks and battery storage.
110–400
kV voltage levels
From transmission networks to energy park and battery storage substations.
872.3
EUR million group revenue 2025
Large contractors have failed in this industry. Your partner can afford to carry the responsibility.
Have a project in mind?
Janne Kananen, Business Director, Energy and Power construction
+358 40 631 8181 janne.kananen@grk.fi Contact usHave a project in mind?
Janne Kananen, Business Director, Energy and Power construction
+358 40 631 8181 janne.kananen@grk.fi Contact usHave a project in mind?
Janne Kananen, Business Director, Energy and Power construction
+358 40 631 8181 janne.kananen@grk.fi Contact usElectricity network construction has significant synergies with the current business. Robust electricity transmission lines require extensive foundation and road infrastructure, which GRK has successfully implemented for several years.
Have a project in mind?
Janne Kananen, Business Director, Energy and Power construction
+358 40 631 8181 janne.kananen@grk.fi Contact usHave a project in mind?
Janne Kananen, Business Director, Energy and Power construction
+358 40 631 8181 janne.kananen@grk.fi Contact usGRK is expanding profitably into new areas of infrastructure construction and strengthening its role in green transition projects.
Electricity network construction has significant synergies with the current business. Robust electricity transmission lines require extensive foundation and road infrastructure, which GRK has successfully implemented for several years. In substation construction, GRK’s experience from rail construction provides experience – railway substations are almost the same. Circular economy materials can also be utilized in our projects.
Construction work for the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.
GRK is responsible for the whole substation, from the 110 kV line connection to the 33 kV switchgear.
We take part already in project development. Design is part of the turnkey delivery.
We make a quotation and agree on the model: general contract, design and build, target cost contract or alliance.
The substation, power line or cable, and their foundations and roads.
We hand over the finished site with its documentation and are responsible for the work during the warranty period.
We assess buildability, methods and costs before the design is locked. A half-finished design is fine.
Design help
We go through the draft with you and propose solutions that are easier and more affordable to build. Someone from the site, who knows how the solution is really built, takes part.
In design and build and target cost contracts, we design ourselves or together with your designer. Our designer stays on board until commissioning and updates the design quickly when something on site goes differently than planned.
As a designer, you can check the method directly with an expert before it goes into your design.
We agree on the delivery model to suit the project. The earlier we are involved, the more we can influence solutions and costs.
This is how we deliver the whole project by industry.
We design, supply, install and commission the energy park substation from the line connection to the switchgear outgoing terminals. At the Kalkkimaa energy park in Tornio, GRK is responsible for the whole substation from the 110 kV line connection to the 33 kV switchgear.
Yes. We deliver 110–400 kV power lines turnkey. For Fingrid, we are building the 400 kV underground cable from Länsisalmi in Vantaa to Viikinranta in Helsinki, the first of its scale in Finland.
Yes. The substation, the power line and their foundations and roads come from the same group.
Yes. The battery storage itself is made and installed by the equipment supplier.
We focus on 110 and 400 kV transmission networks and substations.
Yes. We also deliver 110–400 kV power lines and substations as EPC projects, with engineering, procurement and construction from one supplier.
No. We design a substation or power line as part of a turnkey delivery or an EPC project, but we do not sell design on its own.
Tell us what you need, and the right person will contact you.
Janne Kananen
Business Director, Energy and Power construction
A few sentences are enough. The right expert will get back to you.
Infrastructure is a growth industry where the work matters. With us, you get as much responsibility as you dare to take.